Skip to content
Home / Solutions / Flood forecasting and early warning
Solution

Flood early warning and river flood forecasting

A flood early warning system is only useful if the warning is clear and arrives in time to act. KAI-Hydro runs a calibrated forecast for your river sites every day and turns it into a plain Normal, Watch or Warning, with the expected peak and its date, and alerts by email or SMS.

The challenge

Rivers rise faster than warnings travel. Forecast products exist, but most are maps and probabilities that nobody on the ground has time to interpret.

Our solution

KAI-Hydro runs a daily forecast for your river sites from rainfall forecasts and observed levels, and turns it into a plain statement: Normal, Watch or Warning, with the expected peak and its date. Alerts go out by email or SMS when a threshold is forecast.

Who it is for: Districts, utilities, humanitarian agencies, insurers, developers

Flood forecasting and early warning
Why it works
  • Lead time measured in days, not hours
  • Thresholds agreed with you, not imposed
  • Plain words, not probability maps
  • Forecast skill reported every month
Workflow

How it works, step by step

  1. Sites

    Choose forecast points and gauges.

  2. Thresholds

    Agree Watch and Warning levels.

  3. Model

    Calibrate the basin model on past events.

  4. Run

    Daily 5-day forecasts.

  5. Alert

    Email and SMS when a level is forecast.

Products used

What powers this solution

Interested?

Interested in flood forecasting and early warning?

Contact our team today, or start in the KAI portal.

Guides

Guides on this topic

All KAI guides